Quick answer
Choose Installation by use case and compatibility first, specs second; test locally when possible. Install depends on plumbing/electrical/drain/space.
Why it matters
Stacked specs do not guarantee fit for your use case.
Plumbing.
Step by step
- Check water/hardness/iron/sulfur/use/space.
- Separate equipment/install/plumbing/electrical/drain.
- Get 2-3 quotes; confirm water/equipment/warranty.
- Contract states scope/install/payment/warranty.
Common mistakes
- Buying without water test.
- Ignoring iron/sulfur/space/drain.
- Not checking salt/maintenance/warranty.
- No install/payment terms.
Checklist
- Water/hardness/iron/sulfur/use.
- Equipment/install/plumbing/electrical/drain.
- Space/salt/maintenance/permits.
- Warranty/payment/contract.
- Budget/testing/maintenance.
Key facts
- Plumbing.
- Power.
- Drain.
FAQ
How do I choose Installation?
Choose Installation by use case and compatibility first, specs second; test locally when possible. Install depends on plumbing/electrical/drain/space.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi